T-IV DevCoT‑IV DevCo
Aerial network of connected sites at night

Data-center aggregation

One accountable ecosystem. Site, power, fiber, build, and capital.

Capacity stalls in the seams between vendors. We hold all five pillars under one ecosystem — so your schedule never waits on a handoff, and every risk has an owner.

1,470MW

Current workloads

18

Sites vetted & tracked

$14B

Project capital aligned

12–15mo

Shovel-in-ground → ready for service

Why one ecosystem

Five vendors. Five places to fail.

The land broker hands to the utility. The utility waits on the EPC. The EPC waits on the lender. Every seam is an orphaned risk and a month lost. We remove the seams.

The fragmented model — risk in the seams

Land broker→ hands off/Utility / power→ waits/EPC / build→ waits/Lender / capital→ waits
The T-IV ecosystem — one owner

The five pillars

What "one ecosystem" actually delivers.

01 — Site

Land that's already de-risked

Zoning resolved, access engineered, fiber mapped. We list a site only once it can actually be built on.

Explore vetted sites →

02 — Power

MW-to-meter, not promises

Behind-the-meter generation sourced and contracted, or grid capacity locked with a utility letter in hand (Power Purchase Agreement) — ahead of the interconnection queue.

Source turbine power →

03 — Fiber

Connectivity that's already lit

Carrier presence confirmed and redundant routes secured alongside power — because capacity without connectivity is a warehouse, not a data center.

Explore vetted sites →

04 — Modular build

Factory-built, schedule-fixed

Concrete tilt up, repeatable enclosures from our modular build partner drop onto a prepared pad. Quality is fixed in the factory; the schedule is measured in months.

See modular delivery →

05 — Capital

Capital that closes in escrow

Project capital structured to your drawdown and closed in escrow — verified on both sides, so funding never becomes the schedule's bottleneck.

Talk capital structure →

The delivery model

From feasibility to energized — one schedule.

Five gates, each closed before the next opens. No risk stranded between vendors.

01

Source & vet

Land identification, feasibility, and zoning — resolved before a site enters the portfolio.

02

Secure power

Behind-the-meter generation contracted and escrow-closed, or a utility letter in hand (Power Purchase Agreement) before build begins.

03

Modular build

Factory-built enclosures from our modular partner. Pad-ready delivery — months, not years.

VAR partner

FlexDomes

T-IV DevCo holds a VAR agreement with FlexDomes — the factory-built modular data-center enclosures behind the delivery model. The build capability is contracted, not speculative.

04

Align capital & close

Project capital structured to your draw and closed in escrow — verified and documented on both sides.

05

Energize

Commissioned, powered, and handed over as one accountable delivery — not a stack of vendor invoices.

Solar and wind at golden hour

The clean alternative

Power that doesn't need the grid. Infrastructure that doesn't wait.

Book a project call →

The founders

Built by operators, not advisors.

Scott Swartzbaugh

Co-Founder & Managing Partner

20+ years building high-performance supply chains and strategic supplier partnerships across enterprise technology and critical infrastructure. The person who knows what's available, what's on lead time, and how to move equipment when everyone else is waiting.

Del Roehrick

Co-Founder & Chief Technology Officer

Leads the technology and engineering approach behind the T-IV DevCo aggregator model — the architecture that coordinates site, power, fiber, modular build, and managed services as one accountable ecosystem.

Terry Van Roekel

Partner, Chief Revenue Officer & AI Innovation Officer

Founder of WestPorch LLC. 20+ years in enterprise sales, cybersecurity, and AI infrastructure. Leads commercial strategy and go-to-market at T-IV DevCo. U.S. Navy veteran, Intelligence and Cryptology.

Start a project

One ecosystem. One decision.

Bring a load requirement and a timeline. We'll show you what's in the portfolio and what we can build.

Book a project call →