
Power. Connect. Compute. Anywhere.
Next generation
modular data centers.
Where edge compute will live. T-IV DevCo integrates site, power, fiber, modular build, and capital into one accountable ecosystem — so you break ground on de-risked capacity, not a wish list.
1,470MW
Current workloads
18
Sites vetted
$14B
Capital aligned
One accountable ecosystem
Five hard problems.
One ecosystem.
Most capacity dies in the seams between vendors. We hold all five, so the schedule never waits on a handoff.
Site
Vetted land with zoning, fiber, and access resolved before you ever see the listing.
Power
Behind-the-meter generation secured — measured in MW-to-meter, not promises.
Fiber
Lit, redundant connectivity secured alongside power — because without it, none of the rest works.
Modular build
Concrete tilt up, factory-built, repeatable enclosures — schedule compressed, quality fixed.
Capital
Aligned project capital that closes in escrow — verified on both sides.
The full stack
One stack, power to mission.
Six layers, one ecosystem: behind-the-meter power, a vetted site, lit fiber, a factory-built modular shell, managed services, and the mission running on top — the only thing a customer should have to think about.
Power
Behind-the-meter generation, sourced and verified — the constraint solved before anything else is promised.
Site
Pre-vetted land with fiber, NO water, and zoning resolved — chosen for what a mission needs, not for what was cheapest.
Fiber
Lit, redundant connectivity secured alongside power — the link between physical capacity and the customers who depend on it. Without it, nothing else works.
Modular build
Concrete tilt up, factory-produced, deployable data-center capacity — measured in months, not years.
Managed services
Operated to a provable security and compliance bar, with chain of custody from day one.
Mission
The application running on top — the reason the whole stack exists, and the only thing the customer should have to think about.
Why modular wins
A next-gen modular data center costs about 65% less to build than a hyperscaler campus and delivers in 18 months or less end to end — construction itself runs 12–15 months from shovel in ground to ready for service. Minimal entitlement, zoning, and permitting friction accelerates a delivered data center.
Behind-the-meter power
Land is abundant.
Power is the bottleneck.
Interconnection queues run years. We source verified gas turbines — new-surplus, used, and refurbished — and close them in escrow, so generation arrives ahead of the grid.
- OEM lead times stretch 24–36 months — refurbished units are the fast path.
- Every unit verified both sides: condition, hours, title, deliverability.
- Funds and equipment move together, closed in escrow.
Turbine inventory
Available upon inquiry.
Units move fast in this market. Tell us your output, fuel, and timeline and we'll come back with what's available — verified both sides and closed in escrow.
Inquire about inventory →Vetted sites · MW before acres
Capacity you can break ground on.
Site portfolio
Available upon inquiry.
Every site in the portfolio has cleared our proprietary scoring framework — power, permitting, fiber, and development readiness verified before it reaches you. Tell us your MW requirement and timeline and we'll share locations matched to your deployment.
Request a site brief →How a deal moves
From feasibility to energized.
One ecosystem, five gates. Each closed before the next opens.
Source & vet
We identify land where power and fiber can actually be delivered — then resolve zoning and access before listing it.
Secure power
Behind-the-meter generation sourced and contracted, or grid capacity locked with a utility letter in hand (Power Purchase Agreement).
Modular build
Factory-built enclosures drop onto a prepared pad — schedule measured in months, not years.
Align capital & close
Project capital structured to your draw and closed in escrow — verified on both sides of the table.
Energize
Commissioned, powered, and handed over as one accountable delivery.
The sovereign network
The only place to live.
A mesh of modular data centers — 3.5–90 MW per site, scaling to 500 MW multi-site campuses — sited and powered for sovereignty rather than for the cheapest available rack. Engineered for finance, healthcare, biotech, critical infrastructure, and national defense.
3.5–90MW
Per modular site
1,000
Site network target
3–5 yr horizon
Insights & POV
How we read the market.
Loading the latest data-center news…
Who we serve
Built for organizations that cannot afford failure.
Regulated & sovereign workloads
Compute you can prove is yours.
Finance, healthcare, biotech, and critical infrastructure that need provable compliance, chain of custody, and isolation — not a shared rack in someone else's cloud.
Learn more →Hyperscalers
Re-path a stalled build.
Sunk cost in a project blocked on power, permitting, or capital? We bring coordinated capacity online on a compressed timeline.
Learn more →Regional operators
Scale without assembling the stack.
Turnkey capacity matched to your market and load profile — without building a vendor network from scratch.
Learn more →Edge & distributed
Distributed sites, fast.
Pre-vetted locations, behind-the-meter power, and a repeatable delivery model built for rollout at scale.
Learn more →Start a project
Tell us the load. We'll find the power.
Bring a target MW and a timeline. We'll come back with vetted sites, a power plan, and a path to energized.
Book a project call →